Production
1st Start-Up Complex of the III Workflow Stage (Completed in January 2014)
Taking into consideration the scale of the III workflow stage objectives its construction is being carried out in several start-up complexes, first of which has been completed in January 2014 and second – in October 2015.
1st start-up complex of the III workflow stage:
- Unit: Crude Unit - 3.
- Initial nameplate capacity: 3.7 MTPA.
- Total capacity of the Refinery: 7.74 MTPA.
- Processing depth: 50%.
- Storage tanks: 140,000 cu.m (diesel storage tanks – 80,000 cu.m; crude oil storage tanks – 60,000 cu.m; total volume including relay storage tanks volume of FPS – 332,000 cu.m).
- Five staged water intake, treatment and effluent facilities.
- Capacity of crude oil transportation through oil trunk pipelines of NPEC Oil Refinery . – 7.2 MTPA.
- Connected to the Shaim – Tyumen oil trunk pipeline with the capacity of up to 1.7 MTPA and Ust-Baluk – Kurgan – Ufa – Almetyevsk (UBKUA) with the capacity of up to 5.5 MTPA. Total capacity equals to 7.2 MTPA.